4/20/2015

worknc_training_guide_cad_surface_advanced

http://www.cadfamily.com/a/CAM_CNC_DNC/WorkNC/worknc-training-guide-cad-surface-advanced_9750.html

COPY ENTITIES
1. Select the entities to be copied.
2. Right click to validate.
PASTE ENTITIES
1. To paste the copy into the current drawing or into another drawing in the application, select the Paste
Entities function.
2. Select the insertion point of the copied entities.
3. Click at the required point.
LAYER MANAGEMENT FOR PASTED ENTITIES
The manner in which copied entities are pasted depends on how the Edit > Copy/Paste all Entities in the
Original Layer parameter has been programmed in the Preferences of the general software parameters.
q If this option is checked and you use the Edit > Copy/Paste commands, all copied entities
are pasted into their original layers. When copying from one drawing and pasting into
another, these layers are created if they do not already exist. If you leave this option
deactivated the entities will be copied into the current layer.

No comments: