Instructions for setup and using gas cost calculations

http://www.cadfamily.com/downinfo/300948.html

1. Verify that the line ??GasPressure?? column is enabled both under [Cutting] and [Pierce] sections
2. Under [Pierce] Insert the following: ReducedFeedRate = Nozzle Diameter
3. Add gas prices table, gas prices type table, and columns setup tableNote: the gas prices type table defines if the costing is per meter cube or per tone.If the price type is 0 it means per meter cube, and if 1 ?C it means per tone.To do this, simply insert the following section at the end of the file:// Gas costing information:// Notes for including gas costing calculation in the estimation process:// 1. Verify that the line "GasPressure" column is enabled both under [Cutting] and [Pierce] sections// 2. Under [Pierce] Insert: ReducedFeedRate = Nozzle Diameter// 3. The pricess are in USA $ (last update in Sep 2008 was according to 3.6 rate)