8/25/2010

Agilent-WiMax Connected Solutions

http://www.cadfamily.com/downinfo/300788.html

Test System SetupThe WiMax test system in ADS will integrate and control the ESG/PSG and VSA/PSA toform the WiMax integrated test system. Test results will be collected and presented withuser-friendly displays in ADS.
To set up the test system:Connect ADS to ESGc (or PSG) by LAN or GPIB. The ESGc output is connected to the 1.DUT by an RF cable.
The DUT output is connected to Ch1 of VSA (or PSA) by an RF cable. 2.The DUT uses a power supply set up according to the DUT requirements. 3.The VSA output connects the PC through VXI using an IEEE-1394 card. Before 4.testing, verify the VSA hardware connection (see the following figure). Start the VSAsoftware, then select Utilities > Hardware and check settings in the SelectHardware dialog box for VSA hardware; IEEE-1394, RF tuner, and Input module mustbe marked.

No comments: